|
Column
|
Description
|
|---|---|
|
Asset
|
The asset that is being worked
on in this task and step.
|
|
Assigned
To
|
|
|
Creation
Date
|
The date on which
the task was created.
|
|
Creator
|
The user name
for the creator of the task.
|
|
Locale
Name
|
The target locale
for the project.
|
|
Number
of Tasks
|
Used in the task statistics view, shows the number
of tasks in each aggregated group.
|
|
Phase
|
Workflow phase the workflow
step is in.
|
|
Project
Name
|
The name of the
project containing the task, which in turn contains the step of interest.
|
|
Priority
|
The priority
assigned to this task. A lower number indicates a higher priority
(for example, a task with priority 1 has a higher priority than a
task with priority 2).
|
|
Status
|
|
|
Step
|
The name of the
step being monitored.
|
|
Task
|
An identifying number assigned
to the task.
|